| MOQ: | 1ton |
| Price: | negotiate |
| Standard Packaging: | Standard seaworthy export packing or as customer demands |
| Delivery Period: | 7-15days |
| Payment Method: | L/C,T/T,Western Union |
| Supply Capacity: | 10000tons |
Round Zinc Coating Black Steel Pipes Tubes 1m To 12m ASME Galvanised Steel Pipes STK500
The specification system for galvanized steel pipes typically follows that of their base pipe (welded steel pipe), mainly divided into two categories: imperial specifications and metric specifications.
Usually expressed as nominal diameter (DN) or outer diameter (D) × wall thickness (t).
| Commodity | Hot dipped and pre-galvanized steel pipe |
|---|---|
| OD | 10-600mm (round) |
| Thickness | 1.2-50mm |
| Length | 3-12m or as per customers' requirements |
| Material | Q195--Grade B, SS330, SPC, S185 Q215--Grade C, CS Type B, SS330, SPHC Q235--Grade D, SS400, S235JR, S235JO, S235J2 Q345--SS500, ST52 |
| Standard | GB/T13793-1992, GB/T14291-2006, GB/T3091-1993, GB/T3092-1993, GB3640-88 BS1387/1985, ASTM A53/A36, EN39/EN10219, API 5L, GB/T9711.1-99 etc |
| Zinc Coating | Pre galvanized steel pipe: 60-150g/m² Hot dipped galvanized steel pipe: 200-400g/m² |
| Application | Widely used in Structure, Accessories, Construction, Fluid transportation, machinery parts, the stress parts of the automobile, tractor parts and so on |
| Package | 1) Big OD: in bulk 2) Small OD: packed by steel strips 3) Plastic bags 4) According to customer's requirement |
| Delivery | Normally 7-20 days after get deposits or according to quantity |
| Certification | ISO 9001-2008 BV TUV SGS |
Galvanized steel coil products are mainly used in construction, light industry, automobile, agriculture, animal husbandry, fishery and other industries. Such as building roofs, highway guardrails, sheet metal processing, roof grilles, household appliance enclosures, ventilation ducts, chimneys, kitchen utensils, grain storage and transportation, frozen processing of meat and aquatic products, etc.
Packing Details: In Bundle
Delivery Details: Within 10 days after getting the deposit